
Addressing the AI power challenge in the data center
With GPU servers drawing more and more power, the challenge is to provide this increased power capacity with minimal loss, noise or downtime. Learn more
With GPU servers drawing more and more power, the challenge is to provide this increased power capacity with minimal loss, noise or downtime. Listen to the podcast.
Maury Wood, Vicor’s VP of Strategic Marketing, discusses the challenges, and the power electronics solutions, when it comes to power distribution to AI/ML data centre racks. With GPU servers drawing more and more power, the challenge is to provide this increased power capacity with minimal loss, noise or downtime. The end goal is enhanced scalability, efficiency and power management for AI supercomputers.
Addressing the AI power challenge in the data center
With GPU servers drawing more and more power, the challenge is to provide this increased power capacity with minimal loss, noise or downtime. Learn more
助力好莱坞实现其绿色愿景
ReVolt 是当今电影片场使用大型化石燃料燃烧发电机的更清洁、更环保的解决方案。了解 Vicor 如何为 ReVolt 助力
创新供电网络
关于 Vicor 如何创新供电网络领域的白皮书。提升终端系统性能所需的电源技术
DC-DC 电源模块助力实现 48V/12V 转换
电动汽车和数据中心已经过渡至 48V 架构以提高电源性能。全新的 Vicor 系列 DC-DC 转换器有助于实现这一转变

